Warning: Declaration of Walker_Nav_Menu_Dropdown::start_lvl(&$output, $depth) should be compatible with Walker_Nav_Menu::start_lvl(&$output, $depth = 0, $args = Array) in /home/huttonc5/public_html/wp-content/themes/hcc/snippets/nav-menu-dropdown.php on line 0

Warning: Declaration of Walker_Nav_Menu_Dropdown::end_lvl(&$output, $depth) should be compatible with Walker_Nav_Menu::end_lvl(&$output, $depth = 0, $args = Array) in /home/huttonc5/public_html/wp-content/themes/hcc/snippets/nav-menu-dropdown.php on line 0

Warning: Declaration of Walker_Nav_Menu_Dropdown::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/huttonc5/public_html/wp-content/themes/hcc/snippets/nav-menu-dropdown.php on line 0

Warning: Declaration of Walker_Nav_Menu_Dropdown::end_el(&$output, $item, $depth) should be compatible with Walker_Nav_Menu::end_el(&$output, $item, $depth = 0, $args = Array) in /home/huttonc5/public_html/wp-content/themes/hcc/snippets/nav-menu-dropdown.php on line 0
Manufacturing | Hutton Construction

Ready to Build?

Call 316.942.8855

Category Archives: Manufacturing

Hutton Construction recieved two awards at the Ceco Building Systems’ National Sales Meeting in Las Vegas, NV.  Hutton was recognized for achieving $5 million in cumulative sales and $500,000 in annual sales.   Brett Budd of Hutton Construction accepted the awards from Ceco Vice President of Sales, Lynn Chesnut and Ceco President, Roger Burlingame. Ceco Building… Read More

Date posted: March 28, 2012 | Author: | No Comments »

Categories: Company Manufacturing Work


With nearly 2.5 inches of rain in the last four days, progress presses forward at our AGCO Paint Facility project in Hesston, KS. We broke ground in November 2011 and the mild  winter definitely was beneficial, so it is going to take a lot more than a little rain to slow us down!

Date posted: March 22, 2012 | Author: | No Comments »

Categories: Company Manufacturing Work